Interconnection Study for international HVDC project

September 2015 - December 2015
"Finding the right connection point/substation to integrate an international HVDC interconnector"

The project focus was on conducting a feasibility study on possible connection points for a HVDC connector and on evaluating network constraints and possible network development branches.

Germany